You may use the photos provided that the source is acknowledged.
Adler AGDS – Olympic gas, required pressure and accurate metering
Report
Photos
Photos: captioned uncaptioned
Adler AGDSEnlarge photo
Switching moduleEnlarge photo
Gas heating moduleEnlarge photo
Switching module loopingEnlarge photo
Switching module loopingEnlarge photo
In foreground: hot and cold gas mixing module. In background (from left to right): pressure reduction blocks, control roomEnlarge photo
Pressure reduction blockEnlarge photo
Switching moduleEnlarge photo
Switching moduleEnlarge photo
Control roomEnlarge photo
Control roomEnlarge photo
Mnemonic diagram at flatscreen monitor of automated control system standEnlarge photo
Analyzer cubicleEnlarge photo
Pressure reduction blockEnlarge photo
Pressure reduction lineEnlarge photo
Gas purification moduleEnlarge photo
Gas purification moduleEnlarge photo
Alexey Pakharev, head of bureau for engineering support of projects (Saratovgazavtomatika Plant) and Adler catEnlarge photo
Alexey Pakharev, head of bureau for engineering support of projects (Saratovgazavtomatika Plant) and Adler catEnlarge photo
Adler catEnlarge photo


