Dmitry Doev is Director General of Gazprom Tsentrremont. He was born in July 1966 in Leningrad.

Education

Dmitry Doev graduated from Kalinin Leningrad Polytechnic Institute, majoring in Machine Dynamics and Durability.

Professional experience

He has been part of Gazprom’s team for over 10 years.

2004–2013

Director General of Tsentrenergogaz.

from 2008

Director General of Gazprom Tsentrremont.

Company history

The idea to unite gas industry repair divisions emerged in 1970, when the Soyuzgazenergoremont Production Association (15 branch offices across the USSR) responsible for the repair of gas compressors was established. Initially, turbines were overhauled by the factories that produced compressors. However, Russia’s gas transmission system (GTS) is the world’s largest and much of it is located in the regions with a low population density and a challenging climate. Moreover, the unique GTS was built with gas compressors manufactured by dozens of domestic and foreign producers. So, those were the reasons behind the creation of a company that would be responsible for the repair of all gas compressors operating within the GTS.

The consolidation of Gazprom’s repair assets started in 2005. In April 2008, Gazprom’s Board of Directors resolved to establish the Gazprom Tsentrremont repair holding company.

At present, the holding company is composed of Tsentrenergogaz, Gazenergoservis, Gazprom Elektrogaz, Orgenergogaz, Tuymenskiye Motorostroiteli, Gazprom Podzemremont Orenburg, and Gazprom Podzemremont Urengoy, as well as industry-leading factories and branch offices across Russia. The holding company has over 20,000 employees.

Major activities

Since January 1, 2009, Gazprom Tsentrremont has been responsible for organizing maintenance and repair services at all of Gazprom’s facilities. The company has developed a comprehensive engineering approach and created a unified system of Gazprom’s regulatory and technical documents, determining the procedure for organizing and performing all stages of maintenance and repair, from forward planning to facility commissioning.

Block repair of GTT-12 gas turbine unit

Block repair of GTT-12 gas turbine unit

Inspection of castings

Inspection of castings

Sets of axial compressor blades under processing

Sets of axial compressor blades under processing

Borehole under repair

Borehole under repair

Balancing machine at Turboremont Plant (Gazenergoservis)

Balancing machine at Turboremont Plant (Gazenergoservis)

Aiming to improve the efficiency of the reconstruction and modernization of the Unified Gas Supply System’s facilities under investment projects, in 2013 Gazprom made the decision to extend its engineering contractor service by involving Gazprom Tsentrremont in the activities covering gas trunklines, gas compressors, and auxiliary equipment at compressor stations of gas trunklines, booster compressor stations of gas facilities, compressor stations of underground gas storage (UGS) facilities, gas cooling stations, as well as downhole equipment.

Today, Gazprom Tsentrremont’s core activities include maintenance, inspection and repair, as well as construction and reconstruction of Gazprom’s facilities.

Much of the holding company’s work involves the repair of gas turbine engines and the production of spare parts.

As part of the 2011–2020 Program for Developing Russian UGS Facilities, the holding company is engaged in reconstructing the Stepnovskoye, Sovkhoznoye, Peschano-Umetskoye, Elshanskoye, Punginskoye, Moskovskoye and Kasimovskoye UGS facilities.

Punginskoye UGS facility under construction

Punginskoye UGS facility under construction

At present, Gazprom Tsentrremont makes a direct contribution toward improving the system of gas supply across Russian regions and gasification of areas remote from gas trunklines.

In late September 2015, control and distribution facility No. 16, the largest in Russia, was put onstream. The facility will supply gas to the south of Moscow and the Leninsky and Podolsky Districts of the Moscow Region.

Control and distribution facility No. 16

Control and distribution facility No. 16

Besides, Gazprom Tsentrremont participates in the implementation of the 2014–2017 Program for Reconstructing Gas Distribution Stations (GDSs). Currently, several GDSs located in the Moscow, Belgorod, Volgograd and Ivanovo Regions, as well as in the Republics of Tatarstan and Dagestan, are either being under reconstruction or entering the final pre-construction stage.

Kosinovo GDS after reconstruction

Kosinovo GDS after reconstruction

Gazprom Tsentrremont is also constructing and reconstructing a number of compressor stations.

Environmental protection

Gazprom Tsentrremont operates in compliance with the environmental legislation and the Company’s Environmental Policy, adhering to the established environmental impact standards.

The company has introduced an efficient environmental management system based on the international ISO 14001 standard.

Gazprom Tsentrremont’s environmental policy covers the commitments to efficiently use natural resources and mitigate adverse environmental impacts when designing, constructing, reconstructing, repairing and maintaining Gazprom’s facilities.

As part of the Year of Environmental Awareness declared by Gazprom in 2014, Gazprom Tsentrremont’s employees participated in over 120 environmental campaigns and events aimed mainly at promoting environmental education and raising awareness of environmental protection and nature management.

Social policy

As a socially responsible company, Gazprom Tsentrremont has an individual approach to each employee and promotes corporate culture. The company pays keen attention to making the working conditions as comfortable and safe as possible, providing social guarantees, benefits and compensation, and organizing cultural and sports events.

Mechanic skills competition

Mechanic skills competition

Gazprom Tsentrremont has adopted the Collective Agreement regulating social and labor relations in the company and a number of documents on education, HR, and health care for the company’s employees and their families.

Adherence to safe working practices is a key objective for Gazprom Tsentrremont. As part of the Year of Occupational Safety declared by Gazprom in 2016, the company’s employees will participate in training activities and workshops aimed at advancing their competence in occupational and industrial safety.

Lecture on industrial safety

Lecture on industrial safety

Emergency aid master class

Emergency aid master class

Prospects

Gazprom Tsentrremont’s main objective is to secure smooth functioning of each and every Gazprom facility, which hinges on the quality of repair services. Centralized management of maintenance processes ensures quality control and cost optimization.

Gazprom Tsentrremont’s development prospects for the next years are also linked to Gazprom’s Investment Program that includes large-scale construction and reconstruction of major gas industry facilities responsible for the reliable operation of Russia’s Unified Gas Supply System.

Facility under reconstruction within Gazprom Tsentrremont’s area of operation

Facility under reconstruction within Gazprom Tsentrremont’s area of operation

Gazprom Tsentrremont’s priorities include, inter alia, the introduction of new equipment and advanced technologies and the provision of new marketable repair activities.

Gazprom Tsentrremont’s companies implement a number of measures as part of the program aimed at reducing the dependency on imports.

At present, the holding company’s members retrofit the existing capacities, master the repair practices of new-generation gas turbine drives, purchase production and auxiliary equipment, introduce new technologies, develop innovations, and implement programs for creating and introducing alternative energy sources.

Astra packaged power station with wind turbine manufactured by Gazprom Elektrogaz (subsidiary of Gazprom Tsentrremont)

Astra packaged power station with wind turbine manufactured by Gazprom Elektrogaz (subsidiary of Gazprom Tsentrremont)

Spare part manufacturing

Spare part manufacturing